Project Summary
In November 2007, after delivery by
the ship yard in Portland, OR, the 4,500 ST inland hopper barge Gina
Elizabeth was to be towed to its owners in Petaluma, CA. Argonautics Marine Engineering was hired
for the trip and tow survey. The 254 x 55 x 14.5 ft barge and its tow
gear was surveyed at the Gunderson yard. The 4,300 hp oceangoing tug
Richard Brusco was surveyed at the tug owner's facility. The 1966
build tug was just out of dry dock and in excellent condition with
re-built engines and new tow wires. Because of the open hopper, a Survey
Certificate with weather restrictions was issued. Upon receipt of a
favorable weather window, the tow departed Portland on November 23 and
the barge was successfully delivered to its owners 4 days later.
Scope
of Work
The project scope
included:
-
Survey of the barge
and its tow gear before departure;
-
Verify stability of barge with hopper
fully flooded;
-
Survey of the selected 4,300 hp
oceangoing tug;
-
Provide a comprehensive report to the
underwriters;
-
Survey of the barge upon arrival.