Project Summary
Three low profile container cranes were
relocated from Newark, NJ, to Tampa, FL, using the cargo barge
Atlanta Bridge. After loading and securing the cranes, the tug
East Coast towed the barge to Tampa under favorable weather
conditions, with a tow speed averaging in excess of 8.5 knots. The
highest waves encountered during the 7 day tow were reportedly no more
than 3 ft, well below the design significant wave height of 13.7 ft.
Scope of Work
The project scope
included:
-
Determine design environmental criteria for the tow;
-
Modeling of the barge hull for the motion response analysis;
-
Calculate the design barge motions and resulting inertia loads on
the cranes.
Acknowledgement
Photograph courtesy
of East Coast Cranes. |