Soosan Dry Dock
 

Home
Up
Services
Projects
References
Publications
Search
Contact Us
Client Login

[ Engineered by Argonautiocs Marine Engineering Inc. ]


Providing
marine
 engineering
 services
 since 1992

[ Output plot stress analysis dry dock overhang ]

Output plot stress analysis dry dock overhang

Project Summary

In March 1997, the dry dock Soosan was dry transported from Taranto, Italy to Nantong, China by the heavy-lift ship Mighty Servant 3. Because of the dimensions of the dock, it was overhanging the ship's stern as well as its sides. In order to ensure transport feasibility, a structural analysis of a typical section of the dry dock was performed.

A detailed StruCAD*3D model containing 1,150 beam and 720 plate elements was built to analyze the behavior of the structure when subjected to dynamic loadings during the transport. The FEM analysis showed that the beam and plate stresses were within the allowable limits. The output plot above shows the von Mises stress contours in the plate elements.

Scope of Work

The project scope included:

  • Review available construction drawings of the dry dock;

  • Full structural analysis of a typical dock section subjected to dynamic loading during transport;

  • Check dock frame capabilities with respect to cribbing loads.

Home ] Up ] Services ] Projects ] References ] Publications ] Search ] Contact Us ] Client Login ]

Send mail to webmaster@argonautics.com with questions or comments about this web site.
Copyright © 1996 - 2008 ARGONAUTICS MARINE ENGINEERING, INC.
Last modified: 03/19/08