Schnitzer Crane
 

Home
Up
Services
Projects
References
Publications
Search
Contact Us
Client Login

[ Engineered by Argonautiocs Marine Engineering Inc. ]


Providing
marine
 engineering
 services
 since 1992

[ Crane departing ]

Barge with crane departing Hawaii with destination Portland

Project Summary

After the delivery of two Matson Paceco cranes to Sand Island in Hawaii in September 2002, the cargo barge Z Big 1 was loaded with two container cranes that were sold to Schnitzer Steel Industries in Portland, OR. The first 865 St heavy Mitsui crane with a rail gauge of only 32 ft was loaded over the side by rolling it on its own (turned) boogies over temporary rails. The second crane was sold as scrapped and lifted on the barge in small pieces. After loading, the crane and scrap pieces were secured to the barge deck, and the tow departed. Upon arrival of the tow in Portland, the crane was safely rolled off onto the high quay at high tide and the scrap lifted off.

Scope of Work

The project scope included:

  • Determine design environmental criteria for the tow;

  • Modeling of the barge hull for the motion response and ballast analysis;

  • Calculate the design barge motions and resulting inertia loads on the crane;

  • Simulation of the crane roll-on and roll-off operations and optimization of ballast procedures. 

 Acknowledgement

Photograph courtesy of Rigging International.

Home ] Up ] Services ] Projects ] References ] Publications ] Search ] Contact Us ] Client Login ]

Send mail to webmaster@argonautics.com with questions or comments about this web site.
Copyright © 1996 - 2008 ARGONAUTICS MARINE ENGINEERING, INC.
Last modified: 07/21/08