Offloading Starporter
crane in Nanjing
Project Summary
In July 1993, port
equipment including 6 transtainers and 2 container cranes were
transported from Portland and Los Angeles/Long Beach to Nanjing, China.
The transtainers were rolled on over the
stern in Portland, OR. The Starporter crane (weighing approx. 650 t) was loaded
in Los Angeles, after which the ship shifted to Long Beach for loading
of the Peiner crane (weighing approx. 950 t). The cranes were
skidded on and off over the side of the transport vessel, using tracks
and skid shoes. The skid shoes housed hydraulic jacks for lifting the
cranes. After loading, the cranes were secured to the deck with steel
pipes.
Argonautics Marine
Engineering was hired to supervise the loading operations. Upon arrival
in Nanjing, Argonautics Marine Engineering also supervised the
offloading operation.
Scope
of Work
The project scope
included:
-
Liaison
with ship crew, client and its
offloading contractor;
-
Supervision of the
offloading of all equipment upon arrival in Nanjing, China.
|