Offloading Nanjing Cranes
 

Home
Up
Services
Projects
References
Publications
Search
Contact Us
Client Login

[ Engineered by Argonautiocs Marine Engineering Inc. ]


Providing
marine
 engineering
 services
 since 1992

[ Offloading Starporter crane in Nanjing ]

Offloading Starporter crane in Nanjing

Project Summary

In July 1993, port equipment including 6 transtainers and 2 container cranes were transported from Portland and Los Angeles/Long Beach to Nanjing, China. The transtainers were rolled on over the stern in Portland, OR. The Starporter crane (weighing approx. 650 t) was loaded in Los Angeles, after which the ship shifted to Long Beach for loading of the Peiner crane (weighing approx. 950 t). The cranes were skidded on and off over the side of the transport vessel, using tracks and skid shoes. The skid shoes housed hydraulic jacks for lifting the cranes. After loading, the cranes were secured to the deck with steel pipes.

Argonautics Marine Engineering was hired to supervise the loading operations. Upon arrival in Nanjing, Argonautics Marine Engineering also supervised the offloading operation.

Scope of Work

The project scope included:

  • Liaison with ship crew, client and its offloading contractor;

  • Supervision of the offloading of all equipment upon arrival in Nanjing, China.

Home ] Up ] Services ] Projects ] References ] Publications ] Search ] Contact Us ] Client Login ]

Send mail to webmaster@argonautics.com with questions or comments about this web site.
Copyright © 1996 - 2008 ARGONAUTICS MARINE ENGINEERING, INC.
Last modified: 07/21/08