![[ Launch of the new hopper barge at Gunderson ]](../images/Launch%20of%20hopper%20barge%20at%20Gunderson.jpg)
Launch of the new hopper barge
Project Summary
For the construction of 3 new 4,500
ST dwt inland hopper barge at the Gunderson Yard in Portland, OR,
Argonautics Marine Engineering provided
Owner's
Representation. At irregular intervals, the yard was visited to monitor
progress and inspect the construction quality. Meetings with the yard's
internal QA inspectors were held to review their findings. Final
detailed hull surveys were conducted before and after each launch. The
first barge was successfully delivered in November 2007. The second
barge was delivered in March 2008, followed by the third and
last barge in January 2009.
After the launch and delivery of
each barge, trip & tow
surveys were provided.
Scope
of Work
The project scope
included:
-
Review of the barge design
drawings and calculations;
-
Survey of the barges at various
stages during the construction;
-
Audit the QA department of the
yard;
-
Survey the barges before and
after the launch.
Acknowledgement
Photograph above courtesy
of Gunderson (copyright Ackroyd Photography, Inc.).
Project Photographs
|
|
|
Inspection inside one of the void spaces. |
|
|
|
Midships joint after mating barge ends. |
|
|
|
Inspection of the inside coating. |
|
|
|
Dimensional check of the hopper width. |
|
|
|