Project Summary
Argonautics Marine Engineering was
involved in the delivery of 2 new container cranes to the port of Laem
Chabang in Thailand in July 2004. The cranes were built by Mitsui Engineering &
Shipbuilding at their new yard in Oita, Japan. Both cranes were loaded
onto the heavy-lift ship Dock Express 10, using the forklift
method. Upon securing of the cranes and the associated loose cargo, the
ship departed with destination Thailand, where it arrived 9 days later.
After arrival at the LCIT terminal
in Laem Chabang, preparations for offloading commenced immediately, and
only 3 days later, both cranes were safely offloaded and in
process of being commissioned.
Scope
of Work
The project scope
included:
-
Coordinate loading and
offloading operations
as per the Dockwise Procedures;
-
Liaison
with ship crew, terminal, client and its subcontractors;
-
Inspect cranes and
seafastenings before departure and after arrival;
-
On-site supervision during actual loading and discharge
operations.
Project
Article
The successful transport of the Mitsui
cranes to Laem Chabang was featured in the December 2004 issue of the "Dockwiser"...
Project Photographs
|
|
|
First crane picked up and in process of being skidded forward onto the ship.
|
|
|
|
Forward crane safely loaded and in position; getting ready for number 2.
|
|
|
|
Forward crane skidded aft above the quay and ready to have boogies turned.
|
|
|
|
Turning of the land side boogies before lowering crane onto the rail.
|
|
|
|