![[ Independence Hub towed through La Quinta Channel ]](../images/Independence%20Hub%20Tow-out.jpg)
Independence Hub under tow through the narrow
La Quinta Channel
Project Summary
To tow the large floating offshore platform Independence Hub from
its outfitting yard in Ingleside, TX, to its offshore installation
location in the US Gulf, a large number of local harbor and ocean going
tugs were deployed. Detailed drawings were made for each phase of the
tow-out, showing where each tug was to be positioned and where it was
connected to. Contact between the tug fenders and platform push boards
was checked and potential interference problems were identified.
Scope of Work
The project scope
included:
-
Survey the pre-installed tug
attachment and push points
on the platform;
-
Update local tug data base;
-
Verify compatibility of tug fenders
with push points;
-
Provide detailed tow configuration drawings of the various tow-out
stages, such as unmooring, La Quinta Channel Passage, Corpus Christi
Channel passage, and offshore tow.
Acknowledgement
Photograph courtesy
of Signet Maritime Corporation. |