Project Summary
In June of 2005, a 500 t
heavy old Navy crane was skidding onto the Hickey Marine crane barge
Crystal Gayle at the Hunters Point Shipyard in San Francisco. The legs
and boogies of the crane were first removed and the
whole crane was lowered. Using skid shoes and hydraulic push-pull units,
the crane was slowly pushed onto the barge, over skid track and bridge
beams. During the skidding operation, the barge was continuously
ballasted to compensate for the weight coming onboard, as well as for
the changes in tide.
Scope
of Work
The project scope
included:
-
Model the crane
barge hull and all its void spaces;
-
Simulation of the crane
skid-on and optimization of ballast procedures.
-
Provide on-site assistance
during the actual load-out operation.
Project Photographs
|
|
|
Hydraulic push unit behind aft skid shoe. |
|
|
|
Front skid shoe on bridge beam. |
|
|
|
Front side of crane on barge. |
|
|
|
Deballasting the barge after loading. |
|
|
|