Project Summary

In May of 2004, the 4,000 t drilling module for the BP Holstein Spar was successfully loaded out onto the 400 x 100 ft Crowley cargo barge Atka. The module was constructed by AMFELS in Brownsville, TX, and upon completion, it was skidded onto the barge, using hydraulic push/pull units. To facilitate break-out, additional push jacks were placed behind the skid shoes. During the skidding operation, the barge was continuously ballasted to compensate for the weight coming onboard, as well as for the changes in tide. After loading, the module was seafastened for the tow to its offshore installation site.

Scope of Work

The project scope included:

  • Review and comment on the proposed load-out procedures;

  • Review and verify the ballast procedures;

  • Facilitate a HAZOP/HAZID session for the load-out;

  • Provide on-site assistance during the actual load-out operation.

Project Photographs

Hydraulic pull jacks were used to pull the module onto the barge.

Booster jacks were placed behind the skid shoes to assist with break-out.

First skid shoe going across the barge skid track extension.

Module is slowly skidded from the shore onto the cargo barge.

Home / Services / Projects / References / Publications / Search / Downloads / Contact Us / Industry Links / Client Login

Send mail to webmaster@argonautics.com with questions or comments about this web site.
Copyright © 1992 - 2010 ARGONAUTICS MARINE ENGINEERING, INC.
Last modified: 08/06/10