Project Summary
In November 1994, a total of six
Hibernia sub-modules were loaded onto the ocean-going barge ATM
Discoverer at the Finland Industries construction yard in Marystown,
Newfoundland. The weight of the modules ranged from 150 to 250 t. For
the load-out, self-propelled hydraulic dollies were used. These dollies
were positioned under the strong points of the sub-modules. Special
truss work type support frames were used for the drill floors.
Scope
of Work
The project scope
included:
-
Review
of final load-out procedures;
-
On-site assistance during the actual loading operations;
-
Structural analysis of the load-out frame for the drill floor
modules.
Project Photographs
|
|
|
Drill floor module rotated on shore before loading onto the barge. |
|
|
|
Second module rolled onto the barge, carefully clearing the seafastening structures. |
|
|
|
Next module reaches the bridge plates, ready for loading. |
|
|
|
Last module on the barge over its pre-installed grillage supports. |
|
|
|