![[ Front Runner Spar arrives on Zhong Ren 3 barge ]](../images/Arrival%20Front%20Runner%20Spar.jpg)
Arrival of the Front Runner Spar on the heavy-lift
barge Zhong Ren 3
Project Summary
The 12,100 t Murphy
Exploration & Production Company Front Runner Spar hull was
transported from Jebel Ali to the U.S. Gulf by the semi-submersible
heavy-lift barge Zhong Ren 3. This barge is a converted tanker.
Because of the total length of the Spar hull, 2 stern extensions were
welded to the barge stern to support the Spar's overhanging soft tank. The Spar
was loaded onto the barge, by skidding it on over the stern. The barge’s
buoyancy casings were (temporary) relocated to provide an unobstructed
cargo deck. The contractor provided large amounts of engineering
studies, covering the load-out and transportation of the Spar hull,
including structural analyses of the barge and the Spar, detailed
procedures, stability and motion response calculations, float-off
calculations, etc.
Scope
of Work
The project scope
included:
-
Determine the
design environmental criteria for the tow, based on the anticipated
departure date;
-
Reviewing all
engineering documents and procedures;
-
Recommendations
for the optimum ballast condition of the barge during the tow;
-
Independent
stability and motion response calculations;
-
Calculation of the
barge hull girder deflection in hogging and sagging conditions;
-
Independent
strength analysis of the barge deck subject to high point loads
during load-out and transport;
-
Independent
stability analysis for the critical phases of the offloading.