Project Summary
In April of 2009, the 550 t
dredge Sam Houston was successfully loaded
out onto the dock ship Explorer in West Palm Beach, FL. Because
the ship's ramp could not be used, Argonautics Marine Engineering was
hired to assist with the load-out and transport engineering of the
dredge, which was sold to Nigeria based owners. A site survey of the Ro/Ro quay was
performed. Concept drawings for the load-out were provided. First the
dredge's spud
barge was rolled on to the ship and positioned onto its cribbing blocks.
For the roll-on operation of the heavier dredge, the strength of the
available Ro/Ro ramps was checked, resulting in the need for
reinforcements of these ramps. After successful loading of the dredge,
it was pinned to its spud barge and lowered onto the cribbing blocks.
The dredge was then secured, using custom designed seafastening
stoppers. Upon arrival in Nigeria, the vessel will submerse its dock
deck and the dredge will be floated off.
Scope
of Work
The project scope
included:
-
Survey the load-out location;
-
Detail load-out procedures;
-
Verify the strength of the
Ro/Ro ramps;
-
Design
seafastening arrangement;
-
Provide
construction drawings for the custom stoppers;
-
Provide on-site assistance
during the actual load-out operations.
Project Photographs
|
|
|
Spud barge rolled onto the ship, ready to be lowered onto the cribbing blocks.
|
|
|
|
Dredge picked up by two 18 axle Goldhoffer trailers and rolling towards the ship.
|
|
|
|
Dredge rolled onto the ship and approaching the spud barge which will be pinned to the dredge.
|
|
|
|
After pinning the dredge to the spudbarge, it is lowered onto its cribbing blocks.
|
|
|
|