Lifting the foundation pile of the cargo barge
Project Summary
As part of
the foundation of the concrete footings of the new Carquinez bridge, a
number of large diameter piles needed to be transported to the
construction site and installed (hammered in). For the transport, a
small cargo barge was selected. The transport and upending procedure was
reviewed and calculations were made to determine the reaction load on
the barge at any angle of upending. Based on the maximum reaction load
found, the local barge structure was checked. A 3-D finite element model
of the relevant barge section was made and analyzed. Barge stability at
various stages of upending was also checked.
Early June
2000, the first set of foundation piles were successfully transported
and installed, see also the photograph above.
Scope
of Work
The project scope
included:
-
Review
of pile upending procedure;
-
Calculation of pile reaction loads on the barge and crane hook, as
function of upending angle;
-
Structural analysis barge deck structure, subjected to pile reaction
loads;
-
Stability check barge in transport condition;
-
Stability check barge in various upending phases.