Project Summary
In October 2005, the
Beaver Valley Power Station replacement steam generators and reactor
head were delivered by heavy lift barge Paul Bunyan and offloaded
upon arrival at a special slip in Shippingport, PA.
The barge was carefully ballasted
down and grounded. Hydraulic multi-wheel trailers were rolled onboard
and each 350 t heavy generator was rolled off and moved to the power
plant for installation. Lastly, the 60 t heavy reactor head was rolled
off.
Argonautics Marine
Engineering was hired to provide detailed procedures
for mooring, pre-ballasting and grounding the barge including maintaining
adequate and safe bottom reaction throughout the four roll-off
operations.
Scope
of Work
The project scope
included:
-
Detailed ballast
procedure for grounding the barge and maintaining bottom reaction
throughout the offloading operations;
-
Ballast procedure
to re-float the barge after completion of the roll-off operations;
-
Safety procedures;
-
Mooring calculations.
Acknowledgement
Photograph courtesy