Project Summary

In the summer of 2005, the two AFDB-9 dry dock sections were wet towed from Philadelphia, PA, to Galveston TX. Each dock section measured 350 x 229 ft. A wet tow feasibility study was performed, including a A detailed stability analysis (intact and damaged) and hull bending moment calculation in waves. After a long tow, with a stop over in Key West to avoid some hurricanes, the dock sections safely arrived in Galveston and were put to work.

Scope of Work

The project scope included:

  • Review intact and damaged stability of each section;

  • Establish design environmental criteria for the tow;

  • Check strength of each section subject to wave bending;

  • Estimate required bollard pull for the tow.

Home ] Up ] Services ] Projects ] References ] Publications ] Search ] Contact Us ] Client Login ]

Send mail to webmaster@argonautics.com with questions or comments about this web site.
Copyright © 1996 - 2008 ARGONAUTICS MARINE ENGINEERING, INC.
Last modified: 03/19/08