![[ Dry dock section at work in Galveston ]](../images/Drydock%20in%20operation%20in%20Galveston.jpg)
One section of the dry dock in operation at the new
location
Project Summary
In the summer of 2005, the two AFDB-9 dry
dock sections were wet towed from Philadelphia, PA, to Galveston TX.
Each dock section measured 350 x 229 ft. A wet tow feasibility study was
performed, including a A detailed stability analysis (intact and
damaged) and hull bending moment calculation in waves. After a long tow,
with a stop over in Key West to avoid some hurricanes, the dock sections
safely arrived in Galveston and were put to work.
Scope
of Work
The project scope
included:
-
Review
intact and damaged stability of each section;
-
Establish design environmental
criteria for the tow;
-
Check
strength of each section subject to wave bending;
-
Estimate required bollard pull for the tow.
|