|
![[ Drydocking of the Falrig 78 on a barge ]](images/Drydocking%20Falcon%2068.jpg)
Dry docking of the Falrig
78 on a submersible cargo barge
A partial list of
Argonautics Marine Engineering marine salvage and other on-site marine projects include:
Tow-out
GSF Development Driller I
Engineering, procedures, and on-site assitance for the draft reduction
for tow-out of the semi GSF Development Driller I from Ingleside,
TX, to deeper water offshore...
[ Details ]
Wreck
removal Casitas
Estimate ground reaction and free floating stability of the vessel
Casitas, which ran aground on the Pearl and Hermes Atoll...
[ Details ]
4-th Street bridge
installation
Ballast procedures and on-site assistance for the installation of the refurbished San
Francisco 4-th Street Bridge...
[ Details ]
Inclining Experiment
Stability analysis including an Inclining Experiment for a small
oyster dredge...
[
Details ]
4-th Street bridge removal
Barge selection, ballast procedures, and on-site assistance for the
San
Francisco 4-th Street Bridge removal...
[ Details ]
Rancocas Creek bridge
Procedures and assistance for the recovery and
installation of the Rancocas Creek bridge after the barge on which
it was being erected capsized...
[ Details ]
Oriskany
Preparing U.S.
aircraft carrier Oriskany for its tow from San Francisco to
a potential scrap yard in Texas...
[ Details ]
Yung Chih
Stability analysis during the clean up of
the arrested fishing vessel Yung Chih...
[ Details ]
Molikpaq mating
Supervision of the mating operation of the Molikpaq
arctic caisson drilling rig at the Daewoo yard in Korea...
[ Details ]
Falrig 77 and
Falrig
78 dry docking
Structural analysis barge and cribbing design for dry docking of the
submersible drilling rigs Falrig 77 and the Falrig 78...
[Details]
|